mastodon/spec/controllers/api/v1/timelines
Claire 0092fe50ac Merge branch 'main' into glitch-soc/merge-upstream
Conflicts:
- `.github/workflows/build-image.yml`:
  Upstream entirely refactored this, while we changed the docker repository
  to upload to and disabled the “latest” tag.
  Applied the repository change to `.github/workflows/build-*.yml`, as well
  as disabling native ARMv64 builds.
- `README.md`:
  We have a completely different README.
  Kept ours.
- `app/views/admin/settings/shared/_links.html.haml`:
  Upstream refactored, we had an extra item.
  Refactored as upstream did.
- `spec/controllers/api/v1/timelines/public_controller_spec.rb`:
  Upstream deleted this file, to be replaced by a request spec at
  `spec/requests/api/v1/timelines/public_spec.rb`.
  We had an extra bit about enabling the public timelines because we have
  different defaults than upstream.
  Moved that bit to `spec/requests/api/v1/timelines/public_spec.rb`
2023-07-19 07:35:51 +02:00
..
direct_controller_spec.rb Fix most rubocop issues (#2165) 2023-04-09 11:25:30 +02:00
list_controller_spec.rb Enable Rubocop HTTP status rules (#23717) 2023-02-20 11:16:40 +09:00
tag_controller_spec.rb Refactor and improve tests (#17386) 2022-01-28 00:46:42 +01:00